Bentworth is set within a conservation area and offers a huge amount of architectural character and features all of which have been carried forward into the proposed design scheme. A full design management scheme has been carried out which include an initial cost plan, schedule of works, planning permission, building regulation approval, tender invitation process, nominating a principal contractor and project management.
ASP Murphy Builders have again been awarded the contract, we have worked together on numerous contracts and to date have seamlessly provided our clients with a quality end project that has been on budget and on time.

Existing

Existing

Existing

08/09/14 - Work Commencement

08/09/14 - Work Commencement

08/09/14 - Work Commencement

08/09/14 - Work Commencement

08/09/14 - Work Commencement

17/09/14 - Submerged oil tank construction

17/09/14 - Ready for concrete!

17/09/14 - Reinforced oversite for garage being carried out

17/09/14 - Extension foundations ready for concrete

25/09/14 - Open plan parking!

25/09/14 - The only way is up

30/09/14 - Nearly ready for roof

30/09/14 - Progress with super-structure

07/10/14 - Roof members

07/10/14 - Ready for roof tiles

07/10/14 - Saving date stone and re-locating to prime position

07/10/14 - In the dry!

14/10/14 - Sub-merged oil tank in place

14/10/14 - Natural slate roof covering

14/10/14 - In the dry!

14/10/14 - Structural supports in place

31/10/14 - Scafold down!

31/10/14 - Sliding Sash windows fitted in place

31/10/14 - Ready for the floor screed

07/11/14 - Internal opening to new dining area

07/11/14 - Working on the external drive

07/11/14 - Sneaky peak at the utility!

07/11/14 - Pointing of front elevation complete

07/11/14 - Starting on the patio area

07/11/14 - Hard at it, patio area being constructed

07/11/14 - External Oil fired combi boiler

17/11/14 - External works being carried out

17/11/14 - New shower with bi-folding doors

17/11/14 - Internals nearly complete

17/11/14 - Finishing touches to utility room

17/11/14 - Up and running!

10/12/14 - Electric entrance gates

10/12/14 - Oak framed garage construction

10/12/14 - Completed rear external

10/12/14 - Final part of project being constructed - Oak framed garage

06/02/15 - After waiting for the Oak Frame Joiner... Completion

06/02/15 - Joinery detail

06/02/15 - Electric gates in operation

06/02/15 - Safe walk area around submerged tank

06/02/15 - Garage completed

06/02/15